Documentation
Case History
Case history for GB 3P casing run.
Case history for GB 3P casing run.
White Papers
To answer the question “How fast can we rotate the casing?”
This document provides GB Connections’ Recommended Practice for the care of Finished Casing on Location before running. While this document directly applies to casing provided by GB Connections, GBC licensees and End-Users, the information is generally applicable to any finished casing in the field.
How a Wireless Torque/Tension System (WTTS) sub enables improved horizontal drilling.
A 3PS system promises accurate and reliable measurements of torque and hook load (tension and compression) taken directly from the drill string at the surface.